hstierhoff@nc.r
11-11-2004, 04:02 PM
I have created a slide show with Power Point and saved it as a slide show to change slides every 7 seconds and continuously loop.
I have now set-up Task Scheduler to run this file at a predetermined time. It opens as a slide show on schedule, but only displays the first slide and does not continue to show the remaining slides.
I am running Windows X/P O/S.
I have simply entered the file name which I wish to run in Task Scheduler. Must I enter additional info, or what am I missing?
Thanks!
I have now set-up Task Scheduler to run this file at a predetermined time. It opens as a slide show on schedule, but only displays the first slide and does not continue to show the remaining slides.
I am running Windows X/P O/S.
I have simply entered the file name which I wish to run in Task Scheduler. Must I enter additional info, or what am I missing?
Thanks!